Purchase orders (POs) are how you tell your vendors what you need. Peasy helps you build orders in the cart, submit or create them, send them to vendors, and receive the items when they arrive.
How to Get There
Go to Buy > Purchase Orders in the sidebar.
To start a PO from the page you're already viewing, hover over Buy in the expanded sidebar and click its + button. On desktop with the sidebar collapsed, hover over the Buy icon, then click + beside the Buy heading in the menu that opens. New Purchase Order opens over your current page. The New PO button on the Purchase Orders page opens the same form.
Your First PO
If you're creating your first purchase order, the easiest path is to build it from the cart on the Items page. Peasy groups items by vendor and creates one PO per vendor automatically.
Option A: Build a PO from Your Cart
This is the recommended workflow, especially if you've been working from the Low or Order views.
1. Add Items to Your Cart
- Go to Buy > Items to buy.
- Switch to the Order tab to see what needs ordering.
- Enter a quantity in the Cart Qty column for each item you want to order.
- Click the cart icon in the top-right toolbar to open the cart panel.
2. Review the Cart Panel
The cart panel shows your items grouped by vendor. For each vendor group you'll see:
- The vendor name and total cost
- Each item with its quantity and unit cost
- An email toggle showing whether that vendor's PO will be emailed
- An ETA button to set the expected delivery date
- A pin icon to move a vendor's order to the Later tab if you're not ready to submit it
- A location pin in the header (multi-location accounts) to change the receiving location for that vendor without leaving the cart — the supplier card moves to the new location group instantly
- A Work Order card if any item in the group is co-manufactured (made by the vendor for you), with fields for production date and manufacturing location. See Co-Packer Workflows for details.
If you have multiple locations, items are also grouped by receiving location.
3. Review and Submit
- Click Review & Submit at the bottom of the cart panel.
- The review dialog opens, showing each vendor's order with:
- A PO number you can edit
- An email preview with editable To and CC fields (both accept multiple addresses separated by commas)
- A PDF preview of the PO document
- ETA and receiving location settings
- If you have multiple vendors, move between them using the chevron arrows.
- Choose whether to send emails during submission:
- Send emails on → create the POs and email them to vendors
- Send emails off → create the POs without emailing yet
- Finalize the submission.
Peasy creates the POs, sends any selected emails, and shows a confirmation toast. Successfully created POs are removed from your cart.
What if an email fails to send? If an email can't be delivered (for example, the address is invalid), the affected PO stays in your cart as a draft. The cart panel reopens automatically and shows a warning banner on the vendor's group explaining what went wrong. You can fix the email address and try again — your order is not lost.
Option B: Create a PO Manually
If you want to build a PO from scratch without using the cart:
- Go to Buy > Purchase Orders.
- Click New PO.
- Select the items you want, enter quantities, and assign vendors. Each item's Vendor column defaults to the supplier it's usually bought from, but you can change it from the dropdown on that row — so you can order an item from a different vendor without setting up a separate buy variant. The item list includes both buy items and make items that have a supplier (co-manufacturer templates), so you can order from co-manufacturers the same way you order from vendors.
- At the bottom of the dialog, choose one of three actions:
- Add to Cart — adds the selected items to your cart on the Items to buy page instead of creating a PO right away. Useful when you want to combine items from multiple sources before submitting.
- Review & Send — move to the review step where you can edit PO numbers, ETAs, email recipients, and preview the email or PDF, then submit.
- Create — create the PO without sending.
If the Purchase Orders page is filtered to a location when you start a PO, that location is preselected. From another page, the form starts with your company's default receiving location. Review the receiving location before submitting.
Duplicate PO numbers are caught before you submit. In the Review & Send step, if you type a PO number that's already used by another order — or that matches another PO in the same batch — Peasy shows a small red note under the PO # field ("PO number … is already in use. Please edit.") and a summary in the footer, so you can fix it before submitting rather than after.
Each PO is saved with all of its items. When you submit, Peasy saves each vendor's PO together with its items, so a PO is never left with some items missing. If one vendor's PO can't be saved, the other vendors' POs are still created. If Peasy says a purchase order may have been saved, the connection was lost before Peasy could confirm it. Refresh the Purchase Orders page and look for the order before you submit again, so you don't create a duplicate. One submission can create up to 100 POs, with up to 500 items on each.
Option C: Let Beacon Fill In a New PO
Tell Beacon which vendor to order from and what you need, such as "make a PO to Acme for 40 cases of kraft mailers and 6 rolls of tape." Beacon replies with a button that opens New PO on the Purchase Orders page with that vendor's items checked and their quantities and costs filled in and highlighted. A cost you didn't give Beacon is the item's price on your buy items list, the same cost the dialog fills in when you check the item yourself. Beacon can name only items the vendor supplies; for anything else, add it in the dialog yourself.
Check the items, change anything you like, click Review & Send, and then click Create (for example, Create 1 PO; the count is one PO per vendor). Nothing is saved until you do. Beacon leaves the email checkbox unchecked (it reads Send 0 emails) unless you asked it to send the order, such as "make a PO to Acme for 40 mailers and email it to them"; then the button reads Submit instead, and the email goes out when you click it. If you close the dialog without creating the order, click the button in Beacon again to reopen it. Beacon's values stay filled in until you create the PO or for 30 minutes. On the phone, continue the chat in Peasy on the web.
What You'll See on the PO Page
Each purchase order shows:
| Column | What it means |
|---|---|
| PO Number | A reference number (editable — use your own numbering) |
| Vendor | Who you're ordering from |
| Status | Where the order is in the process (see below) |
| Total | The dollar total for the order |
| Order Date | When the PO was placed; editable inline, and useful for sorting and filtering |
| ETA | Expected delivery date |
| Location | Which location the order is for |
| Tasks & Notes | Internal tasks and notes linked to the PO, shown as a count like 1 note or task or 3 tasks & notes |
Purchase Order Statuses
Cart States
Draft and Pinned describe orders that have not been submitted yet:
- Draft — the vendor's order is still in Cart.
- Pinned — the vendor's order was moved to the Later tab.
These orders stay in the cart and do not appear on the Purchase Orders page or in its Status dropdown. If an email fails during submission, that vendor's order returns to the cart as a draft so you can correct the address and try again.
Statuses on the Purchase Orders Page
| Status | What it means |
|---|---|
| Created | The PO was created without being sent |
| Sent | The PO was sent to the vendor |
| Confirmed | The vendor confirmed the order |
| Partially Received | Some items were recorded through Receive, but not all |
| Received | All remaining items were recorded through Receive |
| Cancelled | The order was cancelled |
You can update the status directly in the table by clicking the status dropdown.
Receiving items through Receive automatically moves the PO to Partially Received or Received based on the quantities recorded. Manually selecting one of those statuses changes the PO's tracking label only—it does not record received quantities or increase inventory. Always use Receive when a physical shipment arrives.
Creating a PO does update the inventory forecast: each expected item appears as a Pending entry in Inventory > Logs. Pending quantities help show what is coming, but they do not increase your current on-hand inventory. Receiving the shipment completes those pending entries and updates on-hand inventory.
Cancelling a Purchase Order
Change the PO's Order Status to Cancelled. Peasy opens a confirmation and checks whether the PO has any linked open work orders. While that check finishes, the confirmation button reads Checking… and cannot be clicked.
If there are no linked open work orders, choose Cancel purchase order to cancel the PO and its unreceived lines. If there are linked open work orders, Peasy asks what should happen to them:
- Go back — leaves the PO and work orders unchanged.
- Keep work order — cancels the PO and its unreceived lines, but keeps the work order as independent work with its PO links removed.
- Cancel work order — cancels the PO, its unreceived lines, and the linked work orders together.
(The Keep and Cancel buttons read "work orders" when more than one is linked.) Anything already received and any completed work orders stay unchanged and linked — only unreceived lines are cancelled. The choice is saved as one change, so Peasy does not leave the PO and work orders in different states if something fails.
A cancelled PO can no longer be emailed to the vendor, so it has no mail icon or Save & Send.
Each row also has a truck icon on the PO Number column. Click it to open the receive panel for that order without leaving the page — useful when a delivery just arrived and you want to check it in straight from the PO list.
Viewing PO Details
Click on any PO to open the detail panel on the right. Here you can see:
- The full list of items on the order with quantities and costs
- Edit line items, quantities, and prices
- Add or remove items from the order
- See the total cost
- A Receive Order button at the top of the items list, plus a per-line Receive button on each item — both open the same receive panel inline so you can check the delivery in without leaving the Purchase Orders page
Send the PO
If you created a PO without sending the email during the review step, or if you want to send it again later, you can email it directly from the PO detail panel.
Step by Step
- Go to Buy > Purchase Orders.
- Click the PO you want to send. The detail panel opens on the right.
- In the panel header, click the mail icon to open the send dialog.
- Review the two tabs:
- Email — preview and edit what will be sent
- PDF — preview the attached purchase order PDF
- On the Email tab, review and edit:
- To — pre-filled from the vendor record. The vendor's email field can hold multiple addresses (separated by commas), and every address listed receives the PO. You can also add or change addresses here for this one send.
- CC — optional additional recipients for this send (also accepts multiple addresses separated by commas). If your business has Purchase orders CC addresses configured in Business Settings, Peasy also copies those addresses automatically.
- Subject — editable, with a suggested default
- Email body — fully editable message
- Click Send PO to send the email.
The PO status updates automatically when appropriate. If the PO is already in a later status, sending it again does not move it backward.
If the email goes out but Peasy can't save the expected date you set in the dialog, it tells you so and closes the dialog. The vendor already has the PO, so set the date on the PO instead of sending again.
Sending a PO from Beacon
Ask Beacon to send a purchase order, for example "send PO-1042 and ask them to confirm the delivery date" or "email PO-1042 to orders@sunrisefarms.com." Beacon never sends the email itself. It replies with a button that opens the send dialog for that PO on the Purchase Orders page, the same one the mail icon opens, with anything you told Beacon (To, CC, subject, or message) filled in and highlighted. Everything else starts the same as when you open it yourself. Beacon only fills in an address you typed in your message or one saved for that vendor.
Review the email, change anything you like, and click Send PO. Nothing is sent until you do. A PO still in your cart is submitted from the cart with Review & Submit, and one on the cart's Later tab needs unpinning back into the cart first. Beacon won't open a cancelled PO. After the email is sent, the button in Beacon opens the same PO's dialog without Beacon's values.
The Action Buttons on a PO
In the PO detail panel header, you’ll see:
| Icon | What it does |
|---|---|
| Opens the send dialog (not shown on a cancelled PO) | |
| Printer | Downloads a PDF you can print or save |
| Trash | Deletes the PO after confirmation |
If You Don’t Send by Email
Not every vendor accepts emailed purchase orders. You can also:
- Print the PO and hand it off, save it, or attach it to your own email
- Call it in and use the PO detail panel as your reference
- Order online using the vendor website saved on the vendor record
If you place the order outside Peasy, update the PO status manually so your team knows it has been placed.
Editing a Purchase Order
Most fields on POs are editable right in the table or in the detail panel:
- PO number, order date, and ETA — edit these inline in the table
- The vendor-facing Purchase order note
- Status
- Line items (quantities, prices)
- The Location (receiving location) — if you have more than one location, change it from the dropdown (map-pin icon) in the PO detail panel. It's editable at any status. Single-location businesses don't see this field.
Changes save automatically.
Changing a PO's location moves any lines that haven't been received yet (or are only partly received) to the new location. Lines you've already fully received stay at the location they were received at, so your receiving history stays accurate.
Let Beacon Stage Line Corrections
Tell Beacon what changed on a PO's lines, such as "the vendor shorted us 5 bolts on PO-1042 and the price is really $4.10." Beacon replies with a button that opens that PO's detail panel on the Purchase Orders page with the new quantities and prices already entered on those lines, and the lines Beacon changed highlighted. Nothing is saved yet.
Check the lines, change anything you like, and save the PO as you would after editing it yourself. If the change affects receipts or bills, the same review step asks which of them to update. Beacon only changes the quantity and unit price of lines already on the PO. If a line changed after Beacon read it, Beacon leaves that line alone and tells you, and it won't stage anything over edits of your own that you haven't saved. If you discard the changes or close the panel, click the button in Beacon again to stage them again. Beacon's changes stay available until you save them or for 30 minutes.
Notes on Purchase Orders
Purchase orders have two different note areas:
- Purchase order note — vendor-facing. Open a PO and use Add > Add note, or click the note icon beside Add, to open the Purchase order note field in the detail panel. The same Add menu offers Add carrier and Add tracking. Use it for instructions or messages the vendor should see. It is saved on the PO itself and appears on vendor-facing PO surfaces, including the PDF.
- Tasks & Notes — internal-only. Open a PO and switch to the Tasks & Notes tab to add private team notes, tasks, reminders, and follow-ups for that PO. Vendors cannot see these collaboration threads.
Payment terms are not set on purchase orders. Track payment terms on bills (and vendor/customer records) instead, because bills are where payment due dates and payables are managed.
Splitting a Purchase Order
If a vendor can only fill part of an order on time and the remaining items are owed later — or you simply want to track a subset of items separately — you can split the remaining items off into their own new purchase order without re-entering anything.
Step by Step
- Go to Buy > Purchase Orders and click the PO you want to split. The detail panel opens on the right.
- In the items list, tick the checkbox on each item you want to move to a new PO.
- A Split button appears at the bottom of the panel. Click it.
- Confirm in the dialog that asks "Create a new purchase order for [#] item[s]?".
Peasy creates a new purchase order containing the selected items and removes them from the original PO. The original PO keeps everything you didn't select.
What the New PO Inherits
The new PO copies the vendor, receiving location, and order type from the original. It gets a fresh PO number and starts in Created status so you can review or send it on its own.
Good to Know
- The split happens all-or-nothing — if anything goes wrong, no items move and no new PO is created.
- Selections are cleared automatically when you switch to a different PO.
- Already-received items can still be moved, but you generally want to split the items that are still pending so the new PO reflects the remaining items the vendor still owes.
Deleting a Purchase Order
If a PO was created by mistake or is no longer needed, you can delete it. There are two ways to start:
- From the table — open the three-dot menu at the end of the PO's row and choose Delete PO.
- From the detail panel — click the PO to open it, then click the trash icon in the panel header.
Either way, Peasy asks you to confirm before the PO is removed.
If the PO has an actual Receive History entry, Peasy keeps the receipt and blocks deleting the PO. Changing a tracking status manually or using Close remainder as short does not create a receipt, so either action still leaves an otherwise unused PO available to delete.
If the PO Has a Linked Work Order
Co-manufactured items create a work order automatically when the PO is made. If you try to delete a PO that still has a linked work order, Peasy shows a dialog listing the affected work order number(s) and asks what you want to do:
- Cancel — nothing is deleted.
- No, keep work order — deletes only the purchase order and keeps the work order in place. The work order is simply no longer linked to a PO.
- Delete Both — deletes the purchase order and the work order(s) together. This also permanently removes any inputs and outputs that were logged against those work orders.
Choose Delete Both only when you're sure you no longer need the work order's production history — deleted logged inputs and outputs cannot be recovered.
Removing One Linked Line
Use Delete item on a PO line when you want to remove only that item. If the line has a linked work order, deleting it is staged like any other edit. When you Review and save the PO changes, the Review Changes dialog lists that work order as its own selectable row: leaving it checked (the default) cancels the work order along with the line, and unchecking it keeps the work order as independent work with its PO link removed. Your choice is applied together with the line change when you save.
Filtering Purchase Orders
- Search — Find POs by number, vendor name, or item
- Location filter — Show POs for a specific location
- Status filter — Show only Created, Sent, Confirmed, Partially Received, Received, or Cancelled POs. Draft and Pinned orders remain in the cart.
Common Questions
Can I create a PO without using the cart? Yes. Go to Buy > Purchase Orders and click New PO to build a purchase order from scratch. You can select items, enter quantities, and assign vendors manually. You can also use the Add to Cart button to send items to your cart instead of creating a PO immediately.
Can I order the same item from a different vendor? Yes — you don't need a separate buy variant just to source an item from another supplier. On the Buy > Purchase Orders > New PO screen, add the item and a quantity, then use the Vendor dropdown on that item's row to pick the supplier you want to order from. It defaults to the item's usual vendor, but you can change it to any active vendor. Peasy groups the order by the vendor you choose, so the same item can go on different vendors' POs over time. (Buy variants are still worth setting up when a vendor has its own SKU, pack size, or price you want kept on file — see Managing Buy Items.)
Can I change a PO's order date? Yes. On the Buy > Purchase Orders page, click the Order Date cell for that PO and pick a new date — it saves right away. The order date can't be left blank. Use ETA for the expected delivery date, which is a separate field.
Can I add items to a PO after submitting it? Yes. Open the PO from the list and use the detail panel to add new line items, change quantities, or adjust prices. Changes save automatically.
What happens when I receive against a PO? The PO status updates to Partially Received if some items are received, or Received once everything arrives. Your on-hand inventory increases at the receiving location. See Receiving Pending Orders for the full process.
Does creating a PO update inventory? Yes, as a forecast. The ordered quantities appear as Pending inventory, so Peasy can show what is expected. Your on-hand count does not increase until you receive the items.
Can I create a PO for multiple locations? Each purchase order is tied to one receiving location. If you need to order the same items for different locations, create a separate PO for each one.
Can I customize the ship-to address on a PO (e.g., my co-packer's address)? Yes — the ship-to on the generated PO PDF is the receiving location's address. To ship a PO directly to a co-packer, 3PL, or another off-site destination, go to Configure > Locations, add a location named for that destination with its full address, then select that location as the receiving location when building the PO. The PDF will then show that location's address as the ship-to. See Co-Packer Workflows for the broader co-packer setup.
How do I duplicate a PO? Right-click a PO row (or use the three-dot menu) and select Duplicate PO. Peasy opens the New PO flow with the vendor and line items filled in. You can then add it to the cart, review and send it, or create it without sending.
Can I add payment terms to a purchase order? Payment terms belong on bills, not purchase orders. Create or link a bill for the PO and set the bill's payment terms there. Vendor and customer records can also store default payment terms.
How do I add freight or shipping costs to a purchase order? Freight is captured on bills, not on purchase orders. Purchase orders track what you ordered and at what unit price. Freight and shipping costs go on the vendor's bill, where Peasy distributes them across your received items for landed cost and COGS. See Managing Bills — Freight Cost for the full walkthrough. You can also create a bill with freight right from the receive panel when checking in a delivery — see Creating a Bill While Receiving.
What's the difference between Draft, Created, and Sent? A Draft is still in the cart and has not been submitted. Created means the PO was saved without being sent. Sent means it was sent to the vendor. You can still edit a sent PO, but the vendor has already received the earlier version.
Good to Know
- PO numbers are editable — use whatever numbering system works for your business.
- You can delete a PO if it was created by mistake — use the Delete PO option in the row's three-dot menu, or the trash icon in the detail panel. See Deleting a Purchase Order.
- When a PO is fully received, it automatically updates to "Received" status.
- POs are linked to the Receive workflow — once items arrive, you mark them as received there.
- The cart persists between visits, so you can add items over time and submit when ready.
- The Later tab in the cart panel lets you save vendor orders you are not ready to submit yet.
- If a vendor has a minimum order amount and your order is below it, the review step shows a warning.
- If a vendor has no email address on file, the review step shows a Missing email badge. Click the badge and select Set vendor's email to add one without leaving the review screen. You can also set vendor emails ahead of time in Managing Vendors.
- Email addresses are validated before sending — the review dialog shows inline errors if an address is missing or invalid, and won't let you submit until they're fixed.
- Multiple recipients on a single PO email — Both the To and CC fields accept comma-separated addresses, and every address receives the email and PDF attachment. Set permanent multi-recipient addresses on the vendor record itself (see Managing Vendors) so you don't have to retype them every time.
- Use Configure > Buy > Default Emails > Purchase orders CC for people who should be copied on every purchase order email. Use the send dialog's CC field for one-off recipients.
- The default email body comes from Configure > Buy > Default Emails > Purchase order template. You can edit it for one send in the send dialog, or change the saved default on that page. Templates support placeholders like
{vendor_name},{purchase_order_number}, and{entity_name}— see Default Emails. - Email sending limits — One PO can be emailed up to 5 times in a rolling 24-hour period. New accounts start with an account-wide limit of 3 or 30 customer-facing emails per rolling 24 hours, based on automated signup checks. Established accounts can send up to 100, and accounts verified for Peasy Payments can send up to 1,000.
- A single email can include up to 3 unique recipients at the lowest new-account level, 10 after that, or 20 after Peasy Payments verification. Your own automatic CC copy does not count. At the lowest level, every recipient must already be saved on a customer or vendor.
- Until Peasy Payments is verified, Peasy removes links typed into the subject or message before sending. Links Peasy creates for the email, such as secure payment or portal links, are kept.
- If you reach a limit, wait for earlier sends to fall outside the rolling 24-hour window, verify Peasy Payments, or contact support to ask about a higher limit.
- The email includes a formatted summary of line items, quantities, costs, totals, and the PDF attachment.
Related
- Managing Buy Items — The items that go on your POs
- Managing Vendors — Set up vendor email and ordering details
- Receiving Overview — What happens when orders arrive
- Managing Bills — Track vendor invoices for your orders
- Comparing Vendor Quotes (RFQs) — Compare vendor pricing before creating a PO